Freedom to build cost reports your way, in minutes, not hours.
🎉 Cost Summary Generator is now available on Mining & Exploration Hub 🎉
Every mining team reports drilling costs differently. Some need it by program, some by project, some by contractor, some by drill type. Until now, getting that view meant exporting per-rig data and stitching it together in a spreadsheet.
Cost Summary Generator lets you build your own cost reports in CorePlan, fast. Generate a cost summary by drill program, or group and filter cost data however you need it, without leaving the platform you already use to run your drill programs.
What it helps you with:
That means better visibility over drilling spend, stronger control over contractor costs, less time spent building reports, and more time to focus on the geology.
Getting started
Cost Summary Generator appears as a new tab in your global dashboard, no setup required.
Who can access it
Access is limited to users with cost viewing permissions. Available for subscribed Mining & Exploration Hub customers on Professional plans and above.
Your existing reports
The Cost Summary Per Rig, Cost Summary Per Hole, and Detailed Cost Breakdown remain available as usual.

